Tuesday, June 29, 2010

With everything busy in my life I finally can get back to blogging.Since the last post I have completed the following:
Primed x 3

Painted x 4( Yes 4 coats, and maybe more to come)

Doors that open and close :)

Hooked up Electricity (4 outlets, a switch, and 13 recessed lighting

Hung a Drop Ceiling 5 inches

Boy that sounds like a lot of work, and believe me it was. Luckily I have a couple good friends (Bob and Chuck) who has been helping me out a ton.

All that I got left now is:

Tile, Carpet and little prettying stuff up, like put door knob handles on doors a little stuff like that.

Without further ado here are some pics:

Here is the stairway down to the basement, I still need to paint it, but if you notice towards the bottom of the stairs near the ceiling part, there is about a 5 inch or more drywall bit. That is covering the drop ceiling, so you cant see above the ceiling

The next picture below shows that I put a another 2x4 along the ceiling, so that I can attach the drywall to it.


The pictures below shows what will be the new play room






Now here are some images of the Warhammer Room AKA Daddy's Den













Sarah wanted to help take pictures, so here we go


And now the best helper of them all

Does she have talent or what?

1 comment:

  1. That looks fantastic man! Great to see so much progress!

    Really quite looking forward to seeing this baby finished!

    ReplyDelete